Costume production target doll body: Dollfie Dream <DD> (height approx. 58cm)
Items produced through this commissioned production service: ① Coat ② Shirt (brown)
③ Shirt (light blue)
④ Pants ⑥ Hair ornaments (dealers)
⑦ Gloves (decorative items)
⑧ Tail (decorative)
The costume you requested has the words "Katsuragi Eishu" on the back of the coat and a picture of a dragon on the inside of the coat. These words and pictures are not commercially available, so we created the printing data on a computer and printed them at a fabric printing factory to prepare the material.
In the photo sent with the order, the dragon is hidden by the feet and clothing, so only about 50% of the dragon's overall shape is visible. The designer will use their imagination to fill in these hidden, unseen parts and then draw them in to create 2D data. The more complex the pattern or design, and the more parts that are hidden, the more difficult it is to digitize.
It takes about 1-2 weeks from sending the printing data to the fabric printing factory until the fabric is completed, so this step is done first.

Once the fabric printing arrangements are complete, we will start making the pants. First, we will create the shape using temporary fabric.

We will sew together the actual material to be used.

The pants are finished.

Next, we will make a light blue shirt. First, we will create the shape using temporary fabric.

We will sew together the actual material to be used.

The light blue shirt is finished.

Next, we will make a brown shirt.

The brown shirt is finished.

Next, we will create the coat with the name "Katsuragi Eishu" on the back, which is the most important part of this project .




We will paste the letters "Katsuragi Eishu" printed at the fabric printing factory .


The coat is finished .



There is a "dragon" pattern printed at a fabric printing factory .

Next, we will make gloves .

The gloves are finished .

Next, we will make a hair accessory.

The hair ornament is finished .

Next, we will make the ornaments that come with the brown shirt.


It's finally finished! The production period was 90 days in total. Thank you for your hard work! (Photo album)